• Home
  • Energy Rating
  • EcoHomes
  • Code for Sustainable Homes
  • Our work
  • Contact us
M P Building Assesors logo
margin
Code for Sustainable Homes
  • Introduction
  • Preliminary Rating Report
  • Design Stage Assessment
  • Post Construction Review
  • Repeat Post Construction review
  • Training / Presentation
  • Design Team Meetings


    Share
View case studies of our latest projects
Post Construction Review

Code assessments are carried out in two phases:
Design Stage Assessment and Post Construction Review.

An initial assessment and interim certification is carried out at the Design Stage then final assessment and certification is carried out after construction (Post Construction Review).

The Post Construction Review is based on the Design Stage Assessment and requires confirmation of compliance including site records and visual inspection.

We check the details match those entered in the Design Stage Code Report through site records and visual inspection or an audit trail of the documentary evidence/photographic evidence provided.

We then prepare the Post Construction Review Report to BRE for certification.

eco house
To download a copy of the updated Technical Guide please visit:

planningportal.gov
(link from old site broken)

or in the Communities and Local Government reference document:

Code for Sustainable Homes Technical Guide April (PDF)

eco house
MPBA is a full member of:
The code for sustainable homesBream ecohomesCommunites and local governmentNHERline
Twitter
Facebook

MP Building Assessors Ltd - Tel: 01621 828 035 - info@mpbuilding.co.uk
Site Map | Useful links